Call us at 0086 13869856893

Our Product Detail

Welcome to our website!

_
_

63Ton hot friction screw press in stock

Deformation correction in the road sleepers repair personnel must go through safety training and carry a valid technical operation certificate, the operator should be familiar with the performance of the machine, structure and so on.

Products Details

This is the description of 63Ton hot friction screw press in stock
 

Products Details

 

 

Main parameters

Unit

JA53-63

J53-100A/B

J53-160B

J53-160C

J53-300

J53-300B

J53-400C

J53-400D

J53-630B

J53-630C

Nominal force

KN

630

1000

1600

1600

3000

3000

4000

4000

6300

6300

Energy

KJ

2.25

5

10

10

20

20

40

40

80

80

Stroke of slide

mm

200

310

360

360

400

400

500

500

600

600

Times of stroke

min-1

35

19

17

17

15

15

14

14

11

11

Minimum shut height

mm

315

320

260

260

300

300

520

520

650

650

Height of bolster

mm

80

100

       

120

120

180

180

Dimention of

front/back

mm

275

500

560

560

650

650

820

820

920

920

working table

left/right

mm

227

450

510

510

570

570

730

730

820

820

 

front/back

mm

1010

1393

1465

1465

1603

1603

3200

3200

3800

3800

Overall size

left/right

mm

1141

1884

2240

2240

2581

2581

2812

2812

4240

4240

 

height

mm

2655

3375

3730

3730

4345

4345

5065

5065

6035

6035

Main motor power

KW

5.5

7.5

11

11

22

22

30

30

55

55

Weight

Kg

2490

5780

8186

9186

12800

13920

21000

22000

41500

45000

 

Main parameters

Unit

J53-1000C

J53-1600C

J53-1600D

J53T-2500

J53-2500C

J53-3150

J53-4000

J53-4000C

J53-6300

J53-8000

Nominal force

KN

10000

16000

16000

25000

25000

31500

40000

40000

63000

80000

Energy

KJ

160

280

280

500

500

700

850

1000

1000

1150

Stroke  of slide 

mm

700

700

700

800

800

800

800

900

900

800

Times of stroke

min-1

10

10

10

9

9

9

9

9

8

8

Minimum shut height

mm

700

750

750

980

980

1100

1100

1120

1130

1130

Height of bolster

mm

200

200

200

280

280

300

300

300

330

330

Dimention of

front/back

mm

1200

1250

1250

2000

1560

2000

2200

2200

2350

2350

working table

left/right

mm

1000

1100

1100

1200

1200

1300

1300

1300

1300

1300

 

front/back

mm

5355

4500

4500

5360

5360

5400

5600

5600

6000

6100

Overall size

left/right

mm

4900

5742

5742

7000

7000

7400

7651

7651

8000

8200

 

height

mm

7290

8090

8090

9410

9410

10185

10200

10385

10535

10605

Main motor power

KW

90

132

132

2X110

2X110

2X160

2X185

2X185

2X200

2X200

Weight

Kg

85000

112000

112000

230000

226000

320000

350000

380000

420000

450000

 

Friction screw presses use safety precautions
First, the purpose of the work In order to ensure the safety of press operators and equipment, specially formulated press using safety technical measures.

Second, the scope of This measure applies to the development of small factories processing Road Road pillow use.

III. Safety and Technical Measures

1. All staff members must participate in the pre-quasi-militarization meeting before the start of construction, clarify the contents of their work and the precautions in their work, and confirm that there is no hidden danger in the on-site safety and carry out hazard identification before starting the work.
2, Deformation correction in the road sleepers repair personnel must go through safety training and carry a valid technical operation certificate, the operator should be familiar with the performance of the machine, structure and so on.
3, before the start of construction shift to confirm the staff's mental state, not allowed to fatigue phenomenon, classes are not allowed to sleep, not drinking, smoking in the workplace.
4, the staff must be wearing the provisions of the labor protection supplies, cuffs should fasten the buckle, the helmet must be capped with a cap.
5, check the safety of the workplace, ready to use the tools and materials needed. The site environment and the tools used, equipment for safety confirmation, no safety problems before starting.
6, check the tools used, the equipment is complete and complete, there is a need to lubricate lubricating parts to lubricate the oil, proofreading, check the model used.
7, many people work together, to have a dedicated command, other personnel to obey the command of unified command, work with each other, good self-security and mutual security.
8,Friction screw press before starting the hydraulic system must check the oil position is qualified, and maintain the appropriate amount of oil, smooth flow of oil.
9, check whether the screws around the equipment is loose, the safety device is a good mold cracks, fixed is solid.
10, check the control button is sensitive, can stop immediately, the system is running properly.
11, press the press design pressure strictly processing, does not allow overload work.
12, found abnormal sound and other phenomena, to immediately stop checking.
 Note: No workpieces, tools and sundries are allowed on the work table of the 

LEAVE A MESSAGE